Cold Rooms / Modular

    Modular Cold Room Manufacturer in India for Fast, Re-locatable Cold Storage

    Modular cold rooms are factory-fabricated PUF panel rooms assembled on-site with cam-lock joinery — making them faster to install, easier to expand and possible to relocate. HyperCold builds modular cold rooms from 4×4 ft pharma chambers to 40×80 ft processing rooms.

    Every modular room ships with PUF panels, doors, refrigeration, electricals and controls — you get a single owner for the full system, from BOQ to commissioning.

    • Cam-lock PUF panels — assembled in days, not weeks
    • Re-locatable — disassemble and re-install at a new site
    • Chiller (+12°C to 0°C) or freezer (-18°C to -25°C) variants
    • Standard and custom sizes from 4×4 ft upwards
    • Daikin / Bitzer refrigeration packaged with the room
    • Pan-India installation crew

    Typical applications

    Hotel walk-in cold rooms
    Restaurant chiller / freezer rooms
    Supermarket back-store cold rooms
    Hospital pharmacy cold rooms
    Dairy & ice-cream parlour storage
    Bakery & confectionery
    Florist & seed storage
    Pilot food-processing units

    Operating Temperature

    +12°C to -25°C

    Relative Humidity

    65–95% (band-dependent)

    Engineering note

    Modular rooms are typically sized for chiller and freezer bands. Sub-zero rooms below -25°C call for a custom industrial build.

    01

    Technical Specifications & Construction

    Every modular cold room we build follows the same engineering discipline — sized to your load, not picked off a brochure. Specifications below reflect typical HyperCold builds.

    PUF panel density
    40 ± 2 kg/m³ (CFC-free polyurethane)
    Panel thickness (chiller)
    80 mm or 100 mm
    Panel thickness (freezer)
    125 mm or 150 mm
    Skin
    0.5 mm PPGL / GI pre-coated steel both sides
    Joinery
    Cam-lock with EPDM gaskets
    Floor
    PUF + chequered Al / heated floor for freezers
    Refrigeration
    Daikin / Bitzer / Emerson scroll or screw
    Refrigerant
    R-404A / R-449A / R-507 as per BIS & MoEF norms
    Controls
    Carel / Danfoss digital with data-logger
    Door
    Hinged / sliding insulated + safety release
    02

    How HyperCold Designs This Cold Room

    These are the design factors we lock down before quoting. Skip any of these and the project either runs hot, drinks electricity, or under-delivers on shelf life.

    Product-specific temperature & humidity

    We design from the commodity's psychrometric envelope, not a generic chiller spec. Different storage life targets get different design points.

    Humidity & moisture control

    Coil sizing, defrost strategy and air-throw decide whether your product dries out, sweats, or holds quality.

    Air change rate & throw pattern

    Velocity through the stack governs uniform pull-down. We engineer 25–60 ACH per room volume, not a default.

    Refrigeration sizing on actual load

    Heat load is calculated from product, infiltration, lighting, defrost, motor and personnel — never a TR/MT thumb rule.

    Panel selection by ambient

    100 mm in moderate zones, 150 mm in Rajasthan / interior MH. Panel density never below 40 kg/m³.

    Serviceable layout & AMC access

    Compressor decks, drain lines and electrical panels laid out for one-hand servicing — saves cost over 10 years.

    03

    What Drives the Project Cost

    We don't quote square-foot rates — every build is BOQ-priced. The factors below decide where your project lands within a realistic range.

    • 01Internal volume in CFT and storage tonnage
    • 02Target temperature band (chiller, freezer, sub-zero, deep-freeze)
    • 03PUF panel thickness and density
    • 04Refrigeration capacity (TR) and compressor brand
    • 05Daily product load and door-opening frequency
    • 06Insulation upgrades for Tier-2 / hot-climate sites
    • 07Civil work, levelling, drainage and trenching
    • 08Electrical infrastructure, DG backup and stabilisation
    • 09Automation level — basic, IoT-enabled, or SCADA
    • 10Installation distance from Sirsaganj base and site access
    • 11GST and statutory inclusions (toggled in BOQ)
    • 12AMC tier — Standard, Pro, or 24×7 Critical
    04

    Why Operators Choose HyperCold

    Fast installation

    Most modular rooms are erected in 3–7 days after panels reach site.

    Re-locatable asset

    Cam-lock joinery lets the entire room be disassembled and re-installed at a new site.

    Phase-wise expansion

    Add bays in future without scrapping existing panels — a tenant-friendly capex model.

    Single accountable vendor

    One BOQ, one warranty, one AMC for panels, refrigeration and electricals.

    05

    Project Process — Enquiry to Handover

    1. 1

      Day 0

      Discovery call

      Product, target shelf life, site location, electrical and budget envelope. WhatsApp or call works.

    2. 2

      Day 1–3

      Heat-load & BOQ

      We send a line-item BOQ — PUF, refrigeration, controls, electricals, installation and AMC priced separately.

    3. 3

      Day 4–7

      Site survey & layout

      Physical or remote survey, civil interface drawings, floor plan, electrical SLD and refrigeration P&ID.

    4. 4

      Week 2–6

      Manufacturing & dispatch

      PUF panels, doors and refrigeration packed and shipped pan-India with serial-numbered traceability.

    5. 5

      Week 6–10

      Installation & commissioning

      Our engineers erect the room, install refrigeration, do leak test, vacuum, charge, pull-down and handover.

    6. 6

      Ongoing

      AMC & 24-hr response

      Quarterly preventive maintenance, calibration, data logs and pan-India emergency support.

    06

    Frequently Asked Questions

    Subsidies & finance that may apply

    Eligibility depends on project type, applicant category, state and current government notification. Below is indicative — verify with the official scheme portal before applying.

    MIDH (State Horticulture Mission)

    Credit-linked back-ended capital assistance for horticulture cold storage and pack houses.

    Read scheme details

    NHB Cold Storage Subsidy

    National Horticulture Board capital subsidy for cold storage and CA storage projects.

    Read scheme details

    MoFPI Integrated Cold Chain (PMKSY)

    Grant-in-aid for integrated pre-cooling, IQF, blast freezing, CA and reefer logistics.

    Read scheme details

    Agriculture Infrastructure Fund (AIF)

    Interest subvention and credit guarantee on bank term loans for post-harvest infrastructure.

    Read scheme details

    PMFME — Micro Food Processing

    Credit-linked subsidy for micro food processing units including small cold rooms.

    Read scheme details

    State Subsidy Schemes

    State Horticulture, Food Processing, SC/ST and SHG components vary by state action plan.

    Read scheme details

    MSME & Bank Finance (CGTMSE, SIDBI, NABARD)

    Term loan and working capital options via scheduled banks, SIDBI, NABARD and cooperatives.

    Read scheme details

    Ready to scope your modular cold room?

    Share your product, room size, and target temperature. We'll send a BOQ-priced quote with PUF, refrigeration, installation, and AMC — pan-India delivery from Sirsaganj, Firozabad.

    WhatsApp