Services / Installation

    Cold Room Installation Service in India — Pan-India Cold Storage Erection and Commissioning

    A cold room is only as good as its installation. HyperCold's installation crew handles civil interface, PUF panel erection, door fitment, refrigeration mounting, piping, leak-test, vacuum, charge, pull-down and handover — across India.

    We install rooms we manufactured, and also commission systems where the client procured equipment separately — provided the design is sound.

    • PUF panel erection with cam-lock alignment
    • Refrigeration piping (insulated, vacuum-tested)
    • Leak test, vacuum to 500 microns, charge
    • Electrical interconnection & SLD compliance
    • Pull-down, calibration and handover documentation
    • Pan-India site teams from our Sirsaganj base

    Typical applications

    New cold rooms (HyperCold-built)
    Cold rooms procured separately
    Cold storage expansions
    Refrigeration retrofit / replacement
    AMC takeover commissioning
    01

    Technical Specifications & Construction

    Every cold room installation we build follows the same engineering discipline — sized to your load, not picked off a brochure. Specifications below reflect typical HyperCold builds.

    Typical install time (modular)
    3–10 days
    Typical install time (bulk cold storage)
    6–14 weeks
    Leak test
    Pressure + vacuum to 500 microns
    Pull-down validation
    Data-logged temperature curve handed over
    Handover documentation
    As-built drawings, SLD, P&ID, O&M manual
    Warranty start
    From day of successful pull-down
    02

    How HyperCold Designs This Cold Room

    These are the design factors we lock down before quoting. Skip any of these and the project either runs hot, drinks electricity, or under-delivers on shelf life.

    Product-specific temperature & humidity

    We design from the commodity's psychrometric envelope, not a generic chiller spec. Different storage life targets get different design points.

    Humidity & moisture control

    Coil sizing, defrost strategy and air-throw decide whether your product dries out, sweats, or holds quality.

    Air change rate & throw pattern

    Velocity through the stack governs uniform pull-down. We engineer 25–60 ACH per room volume, not a default.

    Refrigeration sizing on actual load

    Heat load is calculated from product, infiltration, lighting, defrost, motor and personnel — never a TR/MT thumb rule.

    Panel selection by ambient

    100 mm in moderate zones, 150 mm in Rajasthan / interior MH. Panel density never below 40 kg/m³.

    Serviceable layout & AMC access

    Compressor decks, drain lines and electrical panels laid out for one-hand servicing — saves cost over 10 years.

    03

    What Drives the Project Cost

    We don't quote square-foot rates — every build is BOQ-priced. The factors below decide where your project lands within a realistic range.

    • 01Internal volume in CFT and storage tonnage
    • 02Target temperature band (chiller, freezer, sub-zero, deep-freeze)
    • 03PUF panel thickness and density
    • 04Refrigeration capacity (TR) and compressor brand
    • 05Daily product load and door-opening frequency
    • 06Insulation upgrades for Tier-2 / hot-climate sites
    • 07Civil work, levelling, drainage and trenching
    • 08Electrical infrastructure, DG backup and stabilisation
    • 09Automation level — basic, IoT-enabled, or SCADA
    • 10Installation distance from Sirsaganj base and site access
    • 11GST and statutory inclusions (toggled in BOQ)
    • 12AMC tier — Standard, Pro, or 24×7 Critical
    04

    Why Operators Choose HyperCold

    Single accountable team

    Our installation crew works under the same engineering team that designed the room — issues get resolved in hours, not weeks.

    Pan-India coverage

    We have completed projects in 18+ states; mobilisation lead-time is typically 5–10 days.

    Validated handover

    Data-logged pull-down and signed-off documentation handed over — not just keys-and-go.

    Training included

    Operator training on temperature targets, defrost behaviour, alarm response and basic troubleshooting.

    05

    Frequently Asked Questions

    Subsidies & finance that may apply

    Eligibility depends on project type, applicant category, state and current government notification. Below is indicative — verify with the official scheme portal before applying.

    MIDH (State Horticulture Mission)

    Credit-linked back-ended capital assistance for horticulture cold storage and pack houses.

    Read scheme details

    NHB Cold Storage Subsidy

    National Horticulture Board capital subsidy for cold storage and CA storage projects.

    Read scheme details

    MoFPI Integrated Cold Chain (PMKSY)

    Grant-in-aid for integrated pre-cooling, IQF, blast freezing, CA and reefer logistics.

    Read scheme details

    Agriculture Infrastructure Fund (AIF)

    Interest subvention and credit guarantee on bank term loans for post-harvest infrastructure.

    Read scheme details

    PMFME — Micro Food Processing

    Credit-linked subsidy for micro food processing units including small cold rooms.

    Read scheme details

    State Subsidy Schemes

    State Horticulture, Food Processing, SC/ST and SHG components vary by state action plan.

    Read scheme details

    MSME & Bank Finance (CGTMSE, SIDBI, NABARD)

    Term loan and working capital options via scheduled banks, SIDBI, NABARD and cooperatives.

    Read scheme details

    Ready to scope your cold room installation?

    Share your product, room size, and target temperature. We'll send a BOQ-priced quote with PUF, refrigeration, installation, and AMC — pan-India delivery from Sirsaganj, Firozabad.