Mushroom Compost Unit Service

    Mushroom compost units — bunker, tunnel & blower systems

    Engineered compost units with bunker, tunnel, blower and control panel sized for 20T or 30T compost cycles.
    • Bunker + tunnel design
    • Pre-wetting & mixing area
    • Centrifugal blower with flex pipe / manifold
    • PLC / digital control panel
    Mushroom compost tunnel facility with concrete bunker, steaming compost piles, blower system and control panel

    Typical applications

    Phase-1 bunker composting
    Phase-2 tunnel pasteurisation
    Phase-3 incubation tunnel
    Integrated 20T / 30T cycles

    Operating Temperature

    Tunnel: 45–60°C (phase-2)

    Relative Humidity

    Saturated

    Engineering note

    Bunker is open; tunnels are insulated with controlled airflow.

    01

    Technical Specifications & Construction

    Every mushroom compost unit we build follows the same engineering discipline — sized to your load, not picked off a brochure. Specifications below reflect typical HyperCold builds.

    Panel thickness (tunnel)
    100 mm
    Blower
    Centrifugal, high-static fan with VFD
    Flex pipe
    Insulated manifold with multiple drops
    Controls
    PLC / digital with temperature & RH probes
    02

    How HyperCold Designs This Cold Room

    These are the design factors we lock down before quoting. Skip any of these and the project either runs hot, drinks electricity, or under-delivers on shelf life.

    Phase-1 vs Phase-2 vs Phase-3

    Bunker handles phase-1; insulated tunnels with controlled airflow handle phase-2 (pasteurisation) and phase-3 (incubation).

    Blower sizing

    Critical for uniform aeration; under-sized blowers cause hot spots and uneven compost.

    Cycle scale

    20T and 30T are common starter sizes; commercial farms scale up to 60–100T cycles.

    03

    What Drives the Project Cost

    We don't quote square-foot rates — every build is BOQ-priced. The factors below decide where your project lands within a realistic range.

    • 01Cycle size (20T / 30T)
    • 02Number of tunnels
    • 03Blower capacity & VFD
    • 04Control panel & PLC
    • 05Refrigeration brand and capacity (TR)
    • 06Floor type (PUF + chequered Al vs heated)
    • 07Door type, ante room, electrical and DG backup
    • 08Civil work and site readiness (Extra)
    04

    Why Operators Choose HyperCold

    Engineered, not assembled

    Heat-load, airflow, panel thickness and refrigeration sized for your commodity and site.

    Line-item BOQ

    Transparent panel, refrigeration, accessory, installation and AMC pricing — no lump-sum surprises.

    Pan-India delivery

    Manufactured at Sirsaganj, Firozabad; installed across India with regional service support.

    Subsidy-ready DPR

    Documentation aligned to NHB, MIDH, MoFPI, AIF and state scheme norms.

    05

    Scope split — what we deliver, what your site provides

    Clear scope upfront avoids the most common project-cost surprises. Items marked "subject to" are finalised after technical site evaluation.

    HyperCold scope

    • Heat-load and refrigeration sizing (BOQ-based)
    • PUF panel manufacturing at our Firozabad plant
    • Refrigeration unit supply, piping, charging and leak test
    • On-site panel erection, door fitting and commissioning
    • Control panel, sensors and data-logger (where applicable)
    • Operator handover, AMC kick-off and warranty documentation
    • Bunker + insulated tunnel design
    • Centrifugal blower, VFD, flex pipe / manifold and PLC controls

    Client / site scope

    • Civil work — floor, walls, foundation, plinth (subject to final site inspection)
    • 3-phase electrical supply up to the project room (load to be confirmed after technical evaluation)
    • Earthing pit, MCB / RCCB at the LT panel side
    • Water supply for installation and cleaning
    • Site access — crane / hydra movement, internal pathway and unloading zone
    • Any local permissions (fire NOC, FSSAI, pollution clearance) — subject to scheme guidelines
    • Raw material supply — wheat straw, chicken manure, gypsum (project-specific)
    • Pre-wetting and mixing yard (civil)
    06

    Common mistakes we help clients avoid

    Most of these surface only after commissioning, when fixes are expensive. Catching them at quotation stage protects both shelf life and capex.

    01

    Under-sizing the blower

    Compost needs uniform aeration; an under-sized blower creates hot spots and uneven phase-2 pasteurisation.

    02

    Starting compost before mushroom room is ready

    Compost cycles run to schedule. If the production room is not commissioned, the spawn-run window closes and the batch is lost.

    03

    Under-sizing electrical supply or skipping DG backup

    Cold rooms run year-round. A weak LT supply or no DG plan turns every grid outage into a spoilage event.

    04

    Treating subsidy as a guarantee

    Subsidy eligibility depends on project type, beneficiary category, scheme notification and department verification. Plan financials independent of subsidy approval.

    07

    Reference visuals & build photos

    Indicative engineering visuals — actual build configuration depends on commodity, capacity and site.

    Mushroom compost tunnel facility with concrete bunker, steaming compost piles, blower system and control panel
    Mushroom Compost Unit — engineered build by HyperCold.
    Mushroom compost tunnel
    Bunker + insulated tunnel for Phase-1 and Phase-2 compost.
    Blower and ducting
    Centrifugal blower with VFD for uniform aeration.
    Compost yard
    Pre-wet and mixing yard adjacent to bunker.
    08

    How HyperCold Mushroom Compost Unit compares

    Indicative comparison between a typical local fabricator approach and an engineered HyperCold build. Final scope is confirmed after site inspection.

    Build factorTypical local fabricatorHyperCold engineered
    Sizing basisSquare-feet thumb ruleHeat-load worksheet per commodity & ambient
    Panel & skinGeneric PUF, mixed skinPPGL / GI both sides, 40 ± 2 kg/m³ PUF, cam-lock
    RefrigerationLocally sourced, no brand commitmentDaikin / Bitzer / Emerson — sized to TR
    DocumentationSingle-line quoteLine-item BOQ + DPR aligned to subsidy norms
    Controls & dataMechanical thermostatCarel / Danfoss digital with data-logger
    Handover & AMCVerbal warrantyWritten warranty, SLA-backed AMC, spares planning
    09

    Frequently Asked Questions

    Subsidies & finance that may apply

    Eligibility depends on project type, applicant category, state and current government notification. Below is indicative — verify with the official scheme portal before applying.

    MIDH (State Horticulture Mission)

    Credit-linked back-ended capital assistance for horticulture cold storage and pack houses.

    Read scheme details

    NHB Cold Storage Subsidy

    National Horticulture Board capital subsidy for cold storage and CA storage projects.

    Read scheme details

    MoFPI Integrated Cold Chain (PMKSY)

    Grant-in-aid for integrated pre-cooling, IQF, blast freezing, CA and reefer logistics.

    Read scheme details

    Agriculture Infrastructure Fund (AIF)

    Interest subvention and credit guarantee on bank term loans for post-harvest infrastructure.

    Read scheme details

    State Subsidy Schemes

    State Horticulture, Food Processing, SC/ST and SHG components vary by state action plan.

    Read scheme details

    MSME & Bank Finance (CGTMSE, SIDBI, NABARD)

    Term loan and working capital options via scheduled banks, SIDBI, NABARD and cooperatives.

    Read scheme details

    Ready to scope your mushroom compost unit?

    Share your product, room size, and target temperature. We'll send a BOQ-priced quote with PUF, refrigeration, installation, and AMC — pan-India delivery from Sirsaganj, Firozabad.

    WhatsApp