Mushroom Production Room Service

    Mushroom production rooms — button mushroom growing

    Engineered mushroom production rooms with phase-wise control of temperature, humidity, CO₂ and airflow for incubation and production.
    • Incubation & production phases
    • Temperature 14–24°C (phase-wise)
    • Humidity 80–95% RH control
    • CO₂ exhaust & fresh-air make-up
    Button mushroom production room with tiered racks of growing mushrooms, humidity mist and fresh air ducts

    Typical applications

    Button mushroom farming
    Multi-room production farms
    Spawn run rooms (incubation)
    Production / pinning rooms

    Operating Temperature

    14–24°C (phase-wise)

    Relative Humidity

    80–95% RH

    Engineering note

    Air change rate and CO₂ control are as critical as temperature.

    01

    Technical Specifications & Construction

    Every mushroom production room we build follows the same engineering discipline — sized to your load, not picked off a brochure. Specifications below reflect typical HyperCold builds.

    Panel thickness
    100 mm
    Air change rate
    6–8 ACH typical
    PUF panel density
    40 ± 2 kg/m³ (CFC-free polyurethane)
    Skin
    0.5 mm PPGL / GI pre-coated steel both sides
    Joinery
    Cam-lock with EPDM gaskets
    Refrigeration
    Daikin / Bitzer / Emerson scroll or screw
    Controls
    Carel / Danfoss digital with data-logger
    02

    How HyperCold Designs This Cold Room

    These are the design factors we lock down before quoting. Skip any of these and the project either runs hot, drinks electricity, or under-delivers on shelf life.

    Phase-wise control

    Spawn run vs production phases need different setpoints; programmable controllers automate the cycle.

    CO₂ and fresh air

    Mushrooms generate CO₂; controlled fresh-air make-up keeps CO₂ in optimal range for pinning.

    Rack layout

    5–6 tier rack systems with even airflow distribution maximise yield per sqft.

    03

    What Drives the Project Cost

    We don't quote square-foot rates — every build is BOQ-priced. The factors below decide where your project lands within a realistic range.

    • 01Number of rooms (incubation + production)
    • 02Rack layout and tiers
    • 03CO₂ sensors and fresh-air system
    • 04Refrigeration brand and capacity (TR)
    • 05Floor type (PUF + chequered Al vs heated)
    • 06Door type, ante room, electrical and DG backup
    • 07Civil work and site readiness (Extra)
    04

    Why Operators Choose HyperCold

    Engineered, not assembled

    Heat-load, airflow, panel thickness and refrigeration sized for your commodity and site.

    Line-item BOQ

    Transparent panel, refrigeration, accessory, installation and AMC pricing — no lump-sum surprises.

    Pan-India delivery

    Manufactured at Sirsaganj, Firozabad; installed across India with regional service support.

    Subsidy-ready DPR

    Documentation aligned to NHB, MIDH, MoFPI, AIF and state scheme norms.

    05

    Project Process — Enquiry to Handover

    1. 1

      Step 1

      Site & commodity discovery

      Capacity, commodity, temperature, ambient, power and site access.

    2. 2

      Step 2

      Heat-load & BOQ

      Engineered heat-load, panel and refrigeration sizing, line-item BOQ.

    3. 3

      Step 3

      Fabrication & dispatch

      PUF panel manufacturing at our Firozabad plant, packaged for pan-India dispatch.

    4. 4

      Step 4

      Installation & commissioning

      On-site panel erection, refrigeration installation, leak test, pull-down and handover.

    5. 5

      Step 5

      AMC & uptime

      Annual maintenance contract with response SLA and spares planning.

    06

    Scope split — what we deliver, what your site provides

    Clear scope upfront avoids the most common project-cost surprises. Items marked "subject to" are finalised after technical site evaluation.

    HyperCold scope

    • Heat-load and refrigeration sizing (BOQ-based)
    • PUF panel manufacturing at our Firozabad plant
    • Refrigeration unit supply, piping, charging and leak test
    • On-site panel erection, door fitting and commissioning
    • Control panel, sensors and data-logger (where applicable)
    • Operator handover, AMC kick-off and warranty documentation
    • Phase-wise temperature, humidity and CO₂ control logic
    • Fresh-air make-up and exhaust system

    Client / site scope

    • Civil work — floor, walls, foundation, plinth (subject to final site inspection)
    • 3-phase electrical supply up to the project room (load to be confirmed after technical evaluation)
    • Earthing pit, MCB / RCCB at the LT panel side
    • Water supply for installation and cleaning
    • Site access — crane / hydra movement, internal pathway and unloading zone
    • Any local permissions (fire NOC, FSSAI, pollution clearance) — subject to scheme guidelines
    • Compost supply (buy-in) or attached compost unit — subject to project scope
    • Water for humidity and washdown
    07

    Common mistakes we help clients avoid

    Most of these surface only after commissioning, when fixes are expensive. Catching them at quotation stage protects both shelf life and capex.

    01

    Skipping CO₂ exhaust

    Without a fresh-air make-up + exhaust cycle, CO₂ climbs above 1,500 ppm in days and yield collapses.

    02

    Using normal AC instead of engineered cooling

    A split AC dehumidifies the room. Mushroom rooms need humidity 85–90% — engineered cooling with humidification is non-negotiable.

    03

    Under-sizing electrical supply or skipping DG backup

    Cold rooms run year-round. A weak LT supply or no DG plan turns every grid outage into a spoilage event.

    04

    Treating subsidy as a guarantee

    Subsidy eligibility depends on project type, beneficiary category, scheme notification and department verification. Plan financials independent of subsidy approval.

    08

    Reference visuals & build photos

    Indicative engineering visuals — actual build configuration depends on commodity, capacity and site.

    Button mushroom production room with tiered racks of growing mushrooms, humidity mist and fresh air ducts
    Mushroom Production Room — engineered build by HyperCold.
    Mushroom production room
    Tiered racks with humidity, CO₂ and fresh-air control.
    Mushroom farm exterior
    Multi-room mushroom farm with phased cropping cycles.
    Insulated grow room
    100 mm PUF chamber with sealed joinery for biosecurity.
    Engineered cooling skid
    Engineered cooling with humidification — not a split AC.
    09

    How HyperCold Mushroom Production Room compares

    Mushroom rooms need humidity, CO₂ and fresh-air control simultaneously — a normal AC will not work.

    Build factorSplit-AC retrofit roomHyperCold mushroom room
    Humidity controlDehumidifies (drops below 60%)85–90% RH with humidification
    CO₂ managementNoneFresh-air + exhaust cycle to hold CO₂ < 1000 ppm
    Temperature uniformitySpot coolingEngineered airflow across tiered racks
    BiosecurityOpen envelopeSealed PUF envelope with PPGL skin
    Yield predictabilityHighly variablePhase-locked recipe per crop cycle
    10

    Frequently Asked Questions

    Subsidies & finance that may apply

    Eligibility depends on project type, applicant category, state and current government notification. Below is indicative — verify with the official scheme portal before applying.

    MIDH (State Horticulture Mission)

    Credit-linked back-ended capital assistance for horticulture cold storage and pack houses.

    Read scheme details

    NHB Cold Storage Subsidy

    National Horticulture Board capital subsidy for cold storage and CA storage projects.

    Read scheme details

    MoFPI Integrated Cold Chain (PMKSY)

    Grant-in-aid for integrated pre-cooling, IQF, blast freezing, CA and reefer logistics.

    Read scheme details

    Agriculture Infrastructure Fund (AIF)

    Interest subvention and credit guarantee on bank term loans for post-harvest infrastructure.

    Read scheme details

    State Subsidy Schemes

    State Horticulture, Food Processing, SC/ST and SHG components vary by state action plan.

    Read scheme details

    MSME & Bank Finance (CGTMSE, SIDBI, NABARD)

    Term loan and working capital options via scheduled banks, SIDBI, NABARD and cooperatives.

    Read scheme details

    Ready to scope your mushroom production room?

    Share your product, room size, and target temperature. We'll send a BOQ-priced quote with PUF, refrigeration, installation, and AMC — pan-India delivery from Sirsaganj, Firozabad.

    WhatsApp